Douglas SBD-1 Dauntless, USMC 2-MB-13Visa: Bildspel Mosaik Lista 1October 29, 2021 2October 29, 2021Correct diameter but too deep….🙁 3October 29, 2021 4November 5, 2021Correct diameter and correct depth🙂 5November 5, 20211,5 mm brass tube glued into 2 of 6 holes on the front of the motor. 2. Attempt fits. 6November 5, 2021 7November 5, 2021Brass tubes glued with CA to the front of the fuselage. 8November 6, 2021Engine from the kit. I found the pushrods and ignition wires too massive and removed them. New pushrods of 0.6 mm round rod in place. Wires coming at next. 9November 6, 2021 10November 6, 2021 11November 7, 2021 12November 7, 2021 13November 8, 20211,5 mm brass tube as connector for power supply (3 V DC) 14November 13, 2021Its easier to fit the flaps to the wing before installing the wing to the fuselage. 15November 13, 2021 16November 18, 2021Very good fit. 17November 18, 2021 18November 18, 2021 19November 18, 2021Connection cables successfully soldered. 20November 18, 2021Connection points for inflight configuration and voltage supply for the motor. 21November 18, 2021 22November 20, 2021LSO light (red, green, amber). 1st step: cut out cleaned, rear plate added (0,13 mm plastic), 3 lights (punched with 0,8 mm flattened needle) from colored self adhesive foil. 23November 20, 2021Step 2: transparent cover made of narrow strip of Tesa tape. 24November 20, 2021Step 3: masked with an externally cutted mask (Tamiya tape). 25November 21, 2021Green is a mix of H131 and H2. 26November 21, 2021 27November 21, 2021 28November 28, 2021 29November 28, 2021 30November 28, 2021 31November 28, 2021 32November 29, 2021The result of a good modeling day🙂 33November 29, 2021 34November 29, 2021 35November 30, 2021Last airbrush session: dark grey as antiglare panel. 36November 30, 2021Unfortunately red and yellow are in the wrong place 🙁 so I had to fix them. 37November 30, 2021 38December 5, 2021On course again: yellow stripe is now correct in the middle. 39December 5, 2021 40December 5, 2021For in flight configuration you don’t need the landing legs. 41December 22, 2021Ground plate 1 (left): 40 mm Bambus & printed Dibond sandwich plate. 42December 22, 2021Ground plate 2 (right): 40 mm Bambus & printed Dibond sandwich plate. 43December 22, 2021Both ground plates together. 44December 22, 2021Rear panel 1 (left): printed Dibond sandwich plate & 12 mm birch wood Mux plate 250x50 mm 45December 22, 2021Both rear panels together. 46December 22, 2021 47December 22, 2021Both displays together minus attachments for the SBD’s (2-MB-13 and Hanno’s 2-MB-1) and batteries. 48December 22, 2021 49December 22, 2021 50December 22, 2021 51January 10, 2022Result of the group build: both planes of the VMB-2 together… (right flies the squadron leader, Hanno’s MB-1🙂) 52December 22, 2021 53January 10, 2022 54January 10, 2022 55January 10, 2022 56January 10, 2022 57January 10, 2022 58January 10, 2022 59January 10, 2022 60January 10, 2022 61January 10, 2022 Kommentarer26 December 2024, 19:10 - Project infoDouglas SBD-1 Dauntless, USMC 2-MB-1361 bilder1:48AvslutadGroup BuildScalemates Douglas SBD Dauntless Groupbuild1. November 2021 fram tills 30. Juni 2022All albumsView all albums »