1966 Pontiac GTO - Double Built Visualizar: apresentação de slides Mosaico Lista 1 July 27, 2019
all sprues sorted for the same paint
2 July 27, 2019
the interior
3 July 27, 2019
flat black parts
4 July 27, 2019
gloss black drivetrain
5 July 29, 2019
the interior. take a look at the carpets. decals there for it.
6 July 29, 2019
assambled dashboard
7 July 29, 2019
part 103 won't fit. perhaps widening the holes from the clusters before painting.
8 July 29, 2019
better shot from the carpets 😉
9 July 30, 2019
A small weakness: the hood does not fit as i wished. on the frontshield frame (radius) and has hardly any gaps. I was not sure if I get in trouble after painting.
10 July 30, 2019
Now, after sanding, i'm alright with it.
11 July 30, 2019
here are two spots (left & right side), wich must be reworked.
12 July 31, 2019
now the dashboard ist completed. the handle was no chromepart. its painted with the Molotow pen.
13 July 31, 2019
beautiful redlines . love it!
14 July 31, 2019
and completed the chassis.
15 August 2, 2019
so, here it is. first layer of blue.
16 August 2, 2019
wet sanded the roof 🙁
17 August 8, 2019
started the second GTO...
18 August 8, 2019
assambled interior
19 August 8, 2019
dashboard ready to install
20 August 29, 2019
Both undercarriage ready and on the wheels
21 August 29, 2019
two more layers of paint and wet sanding i'm fine with the result.
22 August 29, 2019
waiting for chrome and clear coat
23 August 29, 2019
same scratches on the second GTO
24 August 29, 2019
same, like the barrier blue...
25 August 29, 2019
engines painted and ready for wiring
26 August 29, 2019
sanded, waiting for the new paint - just ordered a new rattle can "Fontain Blue"*
27 September 2, 2019
hurrah! first layer of "fontain blue" is done
28 September 2, 2019
starting wiring...holes for sparkplugs drilled
29 September 2, 2019
assambled the belts
30 September 2, 2019
steeringpump, alternator, batterie and brakebooster done
31 September 5, 2019
Throttle and fuellines are done
32 September 5, 2019
also brakeline done
33 34 35 September 10, 2019
both engines installed
36 September 10, 2019
forgott to install the hoses for the heater
37 September 10, 2019
and the kompleted distributor
38 September 14, 2019
disributor installed and the firing order
39 September 14, 2019
first engine done
40 September 14, 2019
second done
41 42 September 20, 2019
here it is: bmf work done, clear coat done.
43 44 45 September 26, 2019
and bodies ready. decals done and final layer of clear coat.
46 47 48 October 4, 2019
Next Steps: Enginebay black painted, rubber on the windows done
49 October 4, 2019
windows installed
50 October 4, 2019
firewall and front with cooler installed - don't forget the mirror! (i forgot it on the barrier blue :-D - but fixed the fault)
51 October 4, 2019
the barrier blue near is completetd so fast...thats why i document the fontaine blue. It (test-)fit so well, faster than made pictures.
52 October 4, 2019
a look in the interieur
53 54 October 4, 2019
preview for the first time
55 October 4, 2019
Look at the right side from the dashbord to the sidepanel - its even
56 October 4, 2019
here it has about 1-2mm "overhang"
57 October 7, 2019
Front ready for mounting
58 October 7, 2019
won't fit perfect! - on both cars!
59 60 October 7, 2019
had to thin out the frontend on the bottom
61 62 October 7, 2019
same on the rear bumper. the pins will not get in their holles. cut it and done.
63 October 14, 2019
now...its only a teaser.....thought they are ready...
64 October 14, 2019
whats going on? i had to overpaint the trimlines...
65 66 October 20, 2019
for example, how i work on to psint the sides. some masking, the stripes / sides are wet sanded
67 October 20, 2019
more masking...
68 October 20, 2019
one first preview.
69 70 October 29, 2019
Barrier Blue '66 GTO
71 October 29, 2019
Fontaine Blue '66 GTO
72 Comentários 26 December 2024, 05:30 -
Album info This is a memory built of Revells 1966 GTO.
They would be "Barrier Blue & Fontaine Blue"
82 imagens
1:25
Concluído
Todos os álbuns Ver todos os álbuns »