1
June 9, 2019Ailerons separated from wings (flaps left)2
June 9, 2019Ailerons mounted in new positions3
June 9, 2019Fuselage with vertical stabiliser added4
June 9, 2019Vertical stabiliser with groove and rudder with added half-pipe5
June 9, 2019Canopy splited into two parts6
June 17, 2019Wings attached, filled and sanded7
June 17, 2019Some details added from scratch8
June 28, 2019Cockpit almost from scratch9
August 11, 2022After 3 years, I felt that I should finish this project 😉
Step back, new Fowler's flaps installed.10
August 11, 2022Point of no return.
Cockpit glued into fuselage.11
August 12, 2022Canopy masked...12
August 12, 2022... and painted 🙂13
August 12, 2022Decals designed14
August 12, 2022Air brakes... Always too big and heavy 🙁15
August 12, 2022"Family photo" - air brakes and some wires needed to install them on wings.16
August 12, 2022Decals on model. Now only some matt lacquer and ... gallery in another album 🙂