Grumman F6F-5K/3K Drone Groupbuild Nézet: Diavetítés Mozaik Lista 1October 12, 2016 2November 11, 2016Pattern for holes for ignition wires in the ignition ring (of 0,8x0,8 mm squere rod). 3November 12, 2016It was worthy to use the ANT-parts: looks OK and save a lot of time 4November 12, 2016For comparison: Eduards R-2800 5November 12, 2016A little bit detailing on the inner side of the cowl + thinned edges in the area the cowl-flaps. 6November 13, 2016 7November 13, 2016 8November 14, 2016 9November 14, 2016 10November 15, 2016Hinges as usual in last time made of pins of an electric connecting block. 11November 15, 2016Trailing edge of the fixed surfaces is not inline. In contrast to that the trailing edge of both elevators is inline. It is correct: Eduard done a good work! 12November 18, 2016 13November 18, 2016 14November 21, 2016 15November 24, 2016 16December 1, 2016 17December 1, 2016 18December 1, 2016 19December 4, 2016 20December 4, 2016 21December 4, 2016 22December 4, 2016 23December 4, 2016 24December 7, 2016 25December 7, 2016 26December 7, 2016 27December 8, 2016 28December 8, 2016 29December 10, 2016New pictures with reduced saturation for preventing candy-look. 30December 10, 2016 31December 10, 2016 32October 12, 2016 33December 10, 2016 34December 10, 2016 35December 10, 2016 36January 9, 2017Result of the group build: left is Hanno Kleinecke -3K 37January 9, 2017 38December 10, 2016 39December 10, 2016 40October 12, 2016 41December 1, 2016 42December 10, 2016 43December 10, 2016 44December 10, 2016 45December 10, 2016 46December 10, 2016 47December 10, 2016 48December 20, 2016Reworked antenna configuration: double wire. 49December 20, 2016 Hozzászólások5 December 2024, 03:15 - Project infoGrumman F6F-5K/3K Drone Groupbuild53 képek1:48BefejezveÖsszes albumÖsszes album megtekintése »