CA-72 Project (700)Ver : Diapositivas Mosaico Lista 1September 20, 2022051021: Kit upper hull is split to accommodate different stern in initial Baltimore class cruisers. 2September 20, 2022051021: Fit was not optimal; improved with styrene doubler plates. 3September 20, 2022051023: Flare of fo'c'sle part needed work. 4September 20, 2022051023: Flare of fo'c'sle part needed work. Clay is for ballast. 5September 20, 2022051023: Stern after assembly and sanding. 6September 20, 2022051023: Stern after assembly and sanding. White shim was necessary to hide seam. 7September 20, 2022051023: Three-piece turrets require seam work. 8September 20, 2022051108: Initial paint on deck and turrets. 9September 20, 2022060108: Measure 33-18d Camo applied. Hull colors are MM Acryl 5-L, 5-H, and PS Acryl 5-N 10September 20, 2022060108: Measure 33-18d Camo applied. Deck Hull colors are MM Acryl 20B and 5-O. 11September 20, 2022060130: Looking up to Daddy... 12September 20, 2022060130: CA-72 and CV-10 in two scales: 1/700 and 1/1200. 13September 20, 2022060204: on her bottom 14September 20, 2022060324: Initial outfitting complete 15September 20, 2022060324: Initial outfitting complete 16September 20, 2022060324: Initial outfitting complete 17September 20, 2022 18September 20, 2022 19September 20, 2022080628: Installed in custom case 20September 20, 2022 21September 20, 2022 22September 20, 2022 23September 20, 2022 24September 20, 2022 25September 20, 2022 26September 20, 2022 27September 20, 2022 28September 20, 2022 29September 20, 2022 30September 20, 2022 31September 20, 2022 32September 20, 2022 33September 20, 2022 34September 20, 2022 35September 20, 2022 36September 20, 2022 Comentarios2 December 2024, 01:39 - Album infoUSS PITTSBURGH (CA-72) in 1/700 from Trumpeter kit. OOB with minimal upgrades.USS Pittsburgh (CA-72) (700)36 imágenes1:700TerminadoTodos los álbumesVer todos los álbumes »