USS Philip DD-498Ver : Diapositivas Mosaico Lista 1October 24, 2019Here we go 2October 23, 2019Starting with hull 3October 23, 2019 4November 16, 2019This area is full of trash details 5November 16, 2019Original anchor chains and holes 6November 16, 2019All sanded down and drilled 7November 16, 2019Cleaning and dry-fitting pieces step by step 8November 24, 2019Plaatic propeller shaft has been cut out and replaced with 1mm brass rod 9November 24, 2019New set up in its place, not glued. 10November 24, 2019I will also change the antenna mast,the one comes with the kit is pretty breakable and thin. 11November 24, 2019It will be replaced with 1.5mm brass rod. I am going to scratch build the details of mast. Also details from Eduard set. 12November 24, 2019Original thickness of the antenna mast 13November 24, 2019 14November 24, 2019 Comentarios 2 23 October 2019, 20:00RichmondFollow23 October 2019, 20:57Project infoUSS Philip DD-49814 imágenes1:350En esperaTodos los álbumesVer todos los álbumes »