The back of the cockpit is pretty flat. I put a new back to serve as a base for the canopy's opening mechanism. Also I drilled a couple of holes for cables etc
The main LG is part open. The wheel well is closed and molded and looks bad. So to add some depth, I opened them up (1), and with plasticard and putty, I made 2 quick wells(2). Now are looking better (3)
Main LG, part2. Details. In all wells, chaos rules over cables and hydraulic tubes etc. Some detailing is needed to spice things up. Firstly, had to remove those nasty placeholders.
Pylon holes are big enough to show up even after attaching the pylons. Putty was used to cover them up and then drilled smaller (0,7mm) holes, so not to loose positions and also to add support in the final attachment.
Another tricky job. The windfence was removed and the overwing pylons took its place. Unfortunately, I had to ude Milliput to connect with the small bit under the wing.
Bottom fins attached. Those 2 PE pieces are chaff and flare dispencers, experimental at the time, and from the photos I have, the Nigerian Jag didn't had them on. Will be removed