Grumman TF-9J CougarAnzeigen: Diashow Mosaik Liste 1December 17, 2016Holes for switches of 0,25 mm wire are good visible. 2December 17, 2016Kit-decals for the consoles applied over the etched panels for 3rd dimension. Switches of wire and knobs of round rod in place: 3rd dimension completed. 3December 17, 2016 4December 25, 2016 5December 25, 2016 6December 25, 2016 7December 25, 2016 8December 26, 2016The fit of the windscreen is OK except a little step which had to be removed with 0,13 mm plastic. 9December 28, 2016 10December 28, 2016 11January 2, 2017 12January 2, 2017 13January 2, 2017 14January 2, 2017 15January 2, 2017 16January 2, 2017 17January 2, 2017 18January 3, 2017 19January 3, 2017 20January 12, 2017 21January 12, 2017 22January 12, 2017 23January 12, 2017 24January 15, 2017Landing gear. The nose strut is too short and so I inserted a piece of tube. Unfortunately I lost a half of the nose wheel and had to replace them. 25January 22, 2017 26January 22, 2017 27January 22, 2017 28January 22, 2017 29January 22, 2017 30January 22, 2017 31January 22, 2017 32January 22, 2017 33January 22, 2017 34January 22, 2017 35January 22, 2017 36January 22, 2017 37January 22, 2017 Kommentare26 December 2024, 21:56 - Project infoGrumman TF-9J Cougar37 Bilder1:48FertiggestelltAlle AlbenAlle Alben anzeigen »