Type 42 Build
- 1
- 2
- 3
- 4
- 5
- 6
June 6, 2012
The first Paint is drying, now something liquid. 😉
- 7
- 8
- 9
- 10
- 11
- 12
June 21, 2012
Sheffields Fuselage is complete.
- 13
June 21, 2012
The first parts of the Bridge
- 14
June 21, 2012
And with Bridge on it.
- 15
June 21, 2012
Nottingham needs more work.
- 16
June 21, 2012
Here you can see the long fuselage of the Batch III
- 17
June 29, 2012
HMS Nottingham, still a long way to go (putty) 🙂
- 18
June 29, 2012
HMS Sheffield as she looks now. But I'm not happy with the red coat.
- 19
June 29, 2012
And I fnished my first PE Radar in 1/700 scake. IM very pround on me 🙂
- 20
June 29, 2012
here without paint.
- 21
September 8, 2012
One Cube is 1cm
- 22
- 23
- 24
- 25
- 26
Kommentare
16 November 2024, 14:06 -
Album info
Here i will share my pictures of mny type 42 Build.
26 Bilder
1:700
In Bearbeitung
Alle Alben
Alle Alben anzeigen »