paper modeling database | správa kitníku
Naram
Pierre Pierre (Naram)
FR

DH 2 build in a hotel

Komentáře

16 24 October 2022, 17:14
Pierre Pierre
started to build this DH 2 from the box, i am working from an hotel room and may finish it while still in a hotel room. will see how it come out
24 October 2022, 18:00
Pierre Pierre
Here some cockpit details adding the cables, instruments and copper tube with cable and plastic sprue.
5 December 2022, 05:45
Michael Kohl
Looks pretty good especially in the light of the limited resources at your hand.
5 December 2022, 09:44
Pierre Pierre
thanks a lot Michael, above everything it is the time and the space who is the biggest contraint. But actually it is a real pleasure to built a bit time to time.
5 December 2022, 21:30
S M
Interesting setup 👀 Watching!
10 December 2022, 11:40
David Taylor
I'm in.
10 December 2022, 12:21
Pierre Pierre
finished cockpit and put together the engine, not easy photoetch part are really small even for my twizers .... hope it will old in place
11 December 2022, 10:41
Michael Kohl
Coming along nicely. Beautiful cockpit.
11 December 2022, 11:57
David Taylor
lovely attention to detail.
11 December 2022, 18:53

Album info

in Kyiv, in an hotel, from the box with limited time. super slow now but I do not give up still making model !

12 obrázky
1:48
Probíhá
1:48 DH-2 (Eduard 8094)

Všechna alba

Zobrazit všechna alba »