Kermorvan lighthouse - completed
1
January 29, 2022First 20 parts of thick carboard glued together (base and stairs sidewals).2
January 29, 20223
January 30, 2022This time I plan a rotating white light. Because the mechanical rotation is to complicated I intend to use this time too my CMOS best friend 4017. I will use 10 white SMD LED’s mounted in a circle. 10 capacitor and 10 additional resistors helps to simulate soft change between the LED’s for better simulation of a rotating beacon.4
January 30, 2022LED-array completed. About 12 mm in diameter.5
January 30, 2022LED’s CA glued to a piece of 0,8 mm thick plastic (“carrier”).6
January 30, 20227
January 31, 2022First round with H165 and slightly lighter mix (H165 and H196) for the edges and around the openings. The original is more middle gray than the picture of the kit-artwork (completed Model).8
January 31, 2022Snow white is definitely the wrong color for a lighthouse. A mix of H130 and H196 is the better choice 🙂.9
January 31, 2022Second round with red and brown accents.10
February 2, 2022Third round with light gray for the edges.11
February 2, 202212
February 2, 202213
February 3, 2022Outer glass (second thin PVC as upgrade in contrast to the kit) not yet in place.14
February 3, 2022Inner windows (cardboard framing + thin PVC) in place.15
February 3, 202216
February 5, 2022Slowly things take shape…🙂17
February 5, 20224 outer walls (thin cartboard) in place. Edges sanded with 320 grit paper smooth. Any imperfections fixed with off white and light grey.18
February 5, 2022The stairs consists of 9 steps. Each step consists of 3 parts because of the needed thickness.19
February 5, 2022Completed stairs.20
February 9, 202221
February 9, 202222
February 9, 202223
February 9, 202224
February 9, 202225
February 10, 2022Gaps between wall and rock filled with „wood-putty“. Sanded smooth and engraved the stone structure. First step of painting for the rock completed.26
February 10, 202227
February 10, 202228
February 10, 202229
February 10, 202230
February 12, 2022Base completed.31
February 12, 202232
February 12, 202233
February 12, 202234
February 13, 2022In comparison with Bunthäuser Spitze Kermorvan it’s a true giant!35
February 13, 202236
February 19, 2022Electronic for the rotating beacon.37
February 19, 2022It works!🙂…38
February 19, 202239
February 19, 2022…and it fits into the main part of the lighthouse🙂40
February 24, 2022Upper deck is now completed. It’s hard to believe that this finished assembly consists 175 parts!!41
February 24, 202242
February 24, 202243
February 27, 2022The most complicated and difficult to build part of the Kermorvan lighthouse: the lamphousing and cupola.44
February 27, 202245
March 2, 202246
March 2, 2022Nearly completed….47
March 2, 202248
March 2, 2022Fiat Lux!!49
March 2, 202250
March 5, 202251
March 5, 202252
March 5, 202253
March 5, 202254
March 5, 202255
March 5, 202256
March 5, 202257
March 5, 202258
March 5, 202259
March 5, 202260
March 5, 202261
March 5, 202262
March 5, 202263
March 5, 2022
Коментари
26 February 2025, 10:39 -